San bernard river

Customer: Brazoria County, TX

Location: San Bernard River

RIGID Constructors Marine Division completed over 400,000 cubic yards of suction dredging.

RIGID executed clearing, grubbing, and suction dredging at the mouth of the San Bernard River as it enters the Gulf of Mexico to help alleviate flood events and to allow for better drainage. Conditions called for RIGID’s Dredge Team to dredge 1,500 linear feet through and past the Gulf of Mexico Breakers along with an additional 8,000 linear feet inland.

Previous
Previous

Port of Iberia

Next
Next

coal transfer terminal