Port of Iberia

Port and Site Improvements

Before and after pictures.

RIGID Constructors constructed a new bulkhead facility for the Ports use.

Scope of Work:

  • 500 LF of steel bulkhead system with tie-back wall, waler system, tie-back rods

  • 24,000 SF of Concrete paving

  • 7 EA Mooring Bollards

  • General sitework

  • 3,000 tons of rip rap installed along the bank for stabilization

  • Limestone entrance driveway